09 January 2011

Winter Projects Update

We are on a roll with these projects. Josh usually takes the week between Christmas and the New Year off (use it or lose it by Dec 31), so during that time he got some things done around the house including a couple things off the list.

First, he was able to bring our closet light fixture into Michael's for repair. Left you can see it dangling on the day we moved in. I know right, six months to get that squared away. When the bulb finally burnt out, we knew we didn't have anymore excuses. Michael's is a great little shop on Xerxes and 50th that sells lamps and repairs both lamps and light fixtures. For $35 they rewired and soldered it back together, and we love keeping original details in our house!

Secondly, Josh got our doorbell in working order. The chime has been up for a while with wires attached down to the basement where our transformer is, but everything wasn't connected and our new button hadn't been installed. We were finally able to take the "please knock, doorbell not working" sign off our front door.

Then this weekend we started tackling two items off the list simultaneously—removing paint, and restoring the woodwork downstairs on the stairs. We are using Goof Off to remove unwanted paint and Restor-a-Finish in dark oak to bring it back to life.

We've only tackled the bottom step (I just wanted to try the Restor-a-Finish so bad!), so we have quite a ways to go (on the stairs alone), but we'll post updates as we go.


1 comment:

Unknown said...

Woodwork looks so great guys!!!